| Project: |
Highway
36 Hazardous Waste Treatment and Storage Facility, Last
Chance, CO |
| Owner: |
Browning
Ferris Industries |
| Engineer: |
MK
Engineering |
| Construction: |
June
1988 - December 1989 |
| |
The
project involved 100,000 sy CTB, 100,00 SY RCC for haul
roads, access road, parking areas and processing areas.
It also included approximately 15,000 cy of soil cement
for a sewer lagoon and retention basins. 99% of the work
was completed with GEARS, Inc.'s forces. |
| |
| Project: |
Raw
Water Reservoir and Sludge Lagoons |
| Owner: |
City
of Corpus Christi, TX |
| Engineer: |
Black
and Veatch |
| Prime
Contractor: |
Midwest
Construction Company |
| Construction: |
February
- May 1989 |
| |
GEARS,
Inc. mixed with their ARAN 280 B plant approximately
75,000 cy of soil cement for pond liners in 2.5 months. |
| |
| Project: |
Red
Deer Creek Watershed, Site 14 |
| Location: |
Miami,
TX |
| Engineer: |
US
Corps of Engineers |
| Prime
Contractor: |
Dixon
Paving |
| Construction: |
May
1989 |
| |
GEARS,
Inc. mixed approximately 3,500 cy of soil cement for bank
protection. |
| |
| Project: |
Stage
II Little Snake Diversion Facilities |
| Owner: |
City
of Cheyenne, WY |
| Engineer: |
Woodward
Clyde Consulting Engineers |
| Construction: |
July
1989 - September 1990 |
| |
This
project involved excavation and the processing of the
excavated material for soil cement and the building of 32
dams with this material. The project was an extremely
environmentally sensitive project in a high altitude
remote area of Wyoming. 100% of the project was completed
with GEARS, Inc.'s forces. |
| |
| Project: |
N.
First Avenue Sewer Improvements; Tucson, AZ |
| Owner: |
Pima
County Wastewater Management Department |
| Engineer: |
Jerry
Jones and Associates |
| Prime
Contractor: |
R.E.M.
Construction |
| Construction: |
April
1990 |
| |
GEARS,
Inc. mixed 36,000 tons of soil cement for stabilization. |
| |
| Project: |
Westerly
Creek Dam, Lowry AFB; Denver, CO |
| Owner: |
U.S.
Air Force |
| Engineer: |
U.S.
Army Corps of Engineers |
| Prime
Contractor: |
Tarco,
Inc. |
| Construction: |
October-
November 1990 |
| |
The
project consisted of mixing and placing approximately
7,500 cy of soil cement for a cut off trench and bank
protection. |
| |
| Project: |
Plains
Electric Evaporation Pond, Prewitt, NM |
| Owner: |
Plains
Esclante Generating Station |
| Engineering: |
Gallup
Sand and Gravel |
| Prime: |
Gallup
Sand and Gravel |
| Construction: |
June
1991 |
| |
Project
consisted of mixing soil cement with various % of fly ash
for utilization as pond liners |
| |
| Project: |
Laughlin,
NV Bank Protection |
| Owner: |
City
of Laughlin, NV |
| Engineer: |
CH2M
Hill |
| Prime: |
Ames
Construction |
| Construction: |
June
1992 |
| |
The
project consisted of mixing 8,600 tons of soil cement in
8 days for bank protection. |
| |
| Project: |
West
Elk Mine Retaining Wall |
| Owner: |
Mountain
Coal Company |
| Engineer: |
Envirocon,
Inc. |
| Construction: |
April
1993 |
| |
Project
consisted of mixing 10,000 tons of soil cement for
emergency retaining wall. |
| |
| Project: |
Florence,
AZ |
| Owner: |
Department
of Corrections |
| Construction: |
May
1993 |
| |
Project
consisted of mixing 18,000 tons of soil cement. |
| |
| Project: |
CSX
Intermodal Expansion, Little Ferry, NJ |
| Owner: |
CSX
Railroad |
| Construction: |
September
- November 1994 |
| |
Project
consisted of mixing 34,500 tons of soil cement. |
| |
| Project: |
Foothills
Basin Channel Project |
| Owner: |
City
of Fort Collins, CO |
| Construction: |
October
1994 |
| |
Project
consisted of mixing and placing 5,000 tons of soil cement
for erosion control structures. |
| |
| Project: |
ARCO
Warm Springs Project, MT |
| Owner: |
ARCO |
| Contractor: |
Barnard
Construction, Inc. |
| Construction: |
May
1994 |
| |
Project
consisted of mixing 27,000 tons of soil cement in 10
days. |
| |
| Project: |
North
Deer Creek, Shawnee, OK |
| Owner: |
Soil
Conservation Service |
| Construction: |
March
- April 1995 |
| |
Project
consists of mixing and placing approximately 50,000 tons
of soil cement for erosion control on up stream face of a
new dam. |
| |
| Project: |
Phoenix, AZ
Project |
| Owner: |
ADOT |
| Contractor: |
Ames Construction, Inc. |
| Construction: |
July 1995 |
| |
Project consisted of
mixing 8,000 tons of soil cement. |
| |
| Project: |
Loop 202 - Red Mtn. Expressway, Phoenix,
AZ |
| Owner: |
A.D.O.T. |
| Contractor: |
Ames Construction, Inc. |
| Construction: |
January 1996 - April 1996 |
|
137,941 Tons Soil Cement |
| |
| Project: |
52nd Street Channel Project, Phoenix,
AZ |
| Owner: |
City of Phoenix |
| Contractor: |
Ames Construction, Inc. |
| Construction: |
November 1996 |
|
5,000 CY Soil Cement |
| |
| Project: |
San Antonio Arroyo, Albuguerque,
NM |
| Owner: |
AMAFCA |
| Engineer: |
Bohannan-Huston, Inc. |
| Contractor: |
RMCI |
| Construction: |
March - May 1997 |
|
50,900 Tons Soil Cement |
| |
|
Project:
|
67th Ave. Bridge @ Skunk Creek,
Phoenix, AZ
|
|
Owner:
|
A.D.O.T.
|
|
Contractor:
|
Hunter Contracting, Inc.
|
|
Construction:
|
April & September 1997
|
|
|
24,500 Tons Soil Cement
|
|
|
|
|
Project:
|
Table Rock & North Saluda Filtration Project,
Travelers Rest, SC
|
|
Owner:
|
Greenville Water System
|
|
Engineer:
|
Black & Veatch
|
|
Contractor:
|
Morgan Corporation
|
|
Construction:
|
May 1997
|
|
|
3,365 Tons Soil Cement
|
|
|
|
|
Project:
|
Artesia Municipal Landfill,
Artesia, NM
|
|
Owner:
|
City of Artesia
|
|
Engineer:
|
Smith Engineering
|
|
Contractor:
|
Sema Construction, Inc.
|
|
Construction:
|
October 1997
|
|
|
13,700 Tons Soil Cement
|
|
|
|
|
Project:
|
Calabacillas Arroyo, Albuquerque. NM
|
|
Owner:
|
AMAFCA
|
|
Engineer:
|
Wilson & Co
|
|
Contractor:
|
RMCI / ASI-RCC
|
|
Construction:
|
March - May 1998
|
|
|
65,840 Tons Soil Cement
|
|
|
|
|
Project:
|
Brahman Road Channel, Las Cruces, NM
|
|
Owner
|
Dona Ana Flood Control Commissioner
|
|
Engineer:
|
Andrews, Asbury, and Roberts
|
|
Contractor:
|
Cupit & Company, Inc.
|
|
Construction:
|
September - November 1998
|
|
|
52,314 Tons Soil Cement
|
|
|
|
|
Project:
|
Cherokee Fly Ash Ponds, Denver. CO
|
|
Owner:
|
Public Service Company
|
|
Engineer:
|
Utility Engineers
|
|
Contractor:
|
McDonald Farms
|
|
Construction:
|
December 1998 - February 1999
|
|
|
18,838 Tons SoiI / Flyash
|