Soil Cement
Projects
|
Project: |
Gila River Spur Dike |
|
Location: |
Chandler, AZ USA |
|
Owner: |
Arizona Department of Transportation |
|
Engineer: |
ADOT |
|
Contractor: |
J. Banicki Construction |
|
Construction: |
August, 1999 - August, 1999 |
|
Tons Mixed: |
7,458 |
|
Description: |
Mixed soil cement for placing alone the banks of the Gila River in
Chandler Arizona |
|
|
|
|
Project: |
Glendale Landfill Levee Improvements |
|
Location: |
Glendale, AZ USA |
|
Owner: |
City of Glendale |
|
Engineer: |
Earth Tech |
|
Contractor: |
Valley Rain Construction |
|
Construction: |
November, 1999 - January, 2000 |
|
Tons Mixed: |
90,480 |
|
Description: |
Project mixed soil cement and placed it along the Agua Fria River bank
protecting the landfill from flood waters. |
|
|
|
|
Project: |
Fountain Creek Trail Repairs |
|
Location: |
Colorado Springs, CO USA |
|
Owner: |
ElPaso County Parks |
|
Engineer: |
Kiowa Engineering |
|
Contractor: |
Spaccamonti Excavating |
|
Construction: |
February, 2000 - March, 2000 |
|
Tons Mixed: |
14,629 |
|
Description: |
Soil Cement was placed along the banks of Fountain creek in three
different places to repair the erosion from extreme flooding |
|
|
|
|
Project: |
Sand Creek Trail Improvements |
|
Location: |
Aurora, CO USA |
|
Owner: |
City of Aurora |
|
Engineer: |
Wenk & Associates |
|
Contractor: |
L & M Enterprises |
|
Construction: |
July, 2000 - August, 2000 |
|
Tons Mixed: |
2,987 |
|
Description: |
Project consisted of mixing and placing Soil Cement for a retaining wall |
|
|
|
|
Project: |
Rio Bravo West Extension |
|
Location: |
Albuquerque, NM USA |
|
Owner: |
Bernalillo County Public Works |
|
Engineer: |
Gannett Fleming West |
|
Contractor: |
Albuquerque underground |
|
Construction: |
July, 2000 - August, 2000 |
|
Tons Mixed: |
9,730 |
|
Description: |
Soil Cement was mixed to line the drainage ditch along the side of a new
road |
|
|
|
|
Project: |
Borega Detention Basin |
|
Location: |
Albuquerque, NM USA |
|
Owner: |
AMAFCA |
|
Engineer: |
Wilson & Associates |
|
Contractor: |
Chava Trucking |
|
Construction: |
July, 2000 - September, 2000 |
|
Tons Mixed: |
9,020 |
|
Description: |
Project armored a spillway with soil cement and access roads into the
detention basin |
|
|
|
|
Project: |
Marcy Gulch Channel Stabilization PH I |
|
Location: |
Highlands Ranch, CO USA |
|
Owner: |
Highlands Ranch Metro District |
|
Engineer: |
Muller |
|
Contractor: |
L& M Contruction |
|
Construction: |
November, 2000 - January, 2001 |
|
Tons Mixed: |
5,610 |
|
Description: |
Project consisted of four structures three drop structures and one bank
protection for a test phase of the larger project. |
|
|
|
|
Project: |
Marcy Gulch Channel Stabilization PH II |
|
Location: |
Highlands Ranch, CO USA |
|
Owner: |
Highlands Ranch Metro District |
|
Engineer: |
Muller Engineering |
|
Contractor: |
New Design Construction |
|
Construction: |
November, 2001 - January, 2002 |
|
Tons Mixed: |
19,036 |
|
Description: |
Soil Cement was used for 15 small in channel drop structures for erosion
control and bank stabilization |
|
|
|
|
Project: |
Sand Creek Detention Pond #1 |
|
Location: |
Colorado Springs, CO USA |
|
Owner: |
BRE Springs Ranch |
|
Engineer: |
Kiowa Engineering |
|
Contractor: |
Rice & Rice |
|
Construction: |
February, 2003 - April, 2003 |
|
Tons Mixed: |
33,867 |
|
Description: |
Material was used to line the inside of the slopes in a new detention
basin for future developments. |
|
|
|
|
Project: |
North Transfer Station Access Road |
|
Location: |
Phoenix, AZ USA |
|
Owner: |
City of Phoenix |
|
Engineer: |
MACTEC |
|
Contractor: |
AMES Construction |
|
Construction: |
February, 2004 - April, 2004 |
|
Tons Mixed: |
23,875 |
|
Description: |
Mixed soil cement for shoulder protection on new road plus stabilized
sub base. |
|
|
|
|
Project: |
USAFA Non-Pot #3 |
|
Location: |
Colorado Springs, CO USA |
|
Owner: |
United States Air Force Academy |
|
Engineer: |
S.A. Miro |
|
Contractor: |
Laguna Construction Company, LLC. |
|
Construction: |
June, 2004 - July, 2004 |
|
Tons Mixed: |
8,285 |
|
Description: |
Project relined the inside slope of an existing reservoir after the
outlet works were repaired and the earth dam was replaced |
|
|
|
|
Project: |
Tampa Bay Regional Reservoir |
|
Location: |
Lithia, FL USA |
|
Owner: |
Tampa Bay Water |
|
Engineer: |
HDR |
|
Contractor: |
Barnard Construction |
|
Construction: |
September, 2003 - December, 2004 |
|
Tons Mixed: |
623,525 |
|
Description: |
Two plant mixed soil cement being plated on the slope of a new
reservoir. |
|
|
|
|
Project: |
Everglades Test Section |
|
Location: |
Southbay, FL USA |
|
Owner: |
USACOE |
|
Engineer: |
USACOE |
|
Contractor: |
Barnard Construction |
|
Construction: |
April, 2005 - April, 2005 |
|
Tons Mixed: |
1,196 |
|
Description: |
Testing plant capacity with onsite material part of a possible larger
job |