Project: |
Shawnee State Forest Dam Improvements |
|
Location: |
Portsmouth, OH USA |
|
Owner: |
Ohio Department of Natural Resources |
|
Engineer: |
ODNR Department of Engineering |
|
Contractor: |
Lodebar |
|
Construction: |
May, 1999 - June, 1999 |
|
Tons Mixed: |
15,148 |
|
Description: |
Project consisted of placing RCC on the downstream slope of three
different dams with in the Shawnee state park then covered with topsoil. |
|
|
|
|
Project: |
4th Street Low Water RCC Dam |
|
Location: |
Ft Worth, TX USA |
|
Owner: |
Tarrant County Regional Water District |
|
Engineer: |
Tarrant County |
|
Contractor: |
Craig Olden, Inc. |
|
Construction: |
August, 1999 - September, 1999 |
|
Tons Mixed: |
20,620 |
|
Description: |
Dam was built instream for flood control and created a upstream
recreational lake. |
|
|
|
|
Project: |
Atlanta Road Dam |
|
Location: |
Marietta, GA USA |
|
Owner: |
Paces Properties |
|
Engineer: |
Schnabel |
|
Contractor: |
Thalle Construction |
|
Construction: |
October, 1999 - November, 1999 |
|
Tons Mixed: |
3,805 |
|
Description: |
Project was constructed for a storm water detention basin to mitigate
increased runoff from a new development |
|
|
|
|
Project: |
Lake Tholloco Dam Repair |
|
Location: |
Ft Rucker, AL USA |
|
Owner: |
U.S. Army Corp Of Engineers |
|
Engineer: |
Law Gibb Group |
|
Contractor: |
Thalle Construction |
|
Construction: |
February, 2000 - June, 2000 |
|
Tons Mixed: |
52,600 |
|
Description: |
RCC was used for an emergency spillway repairing this breached dam from
overtopping and bringing it into current dam safety guidelines. |
|
|
|
|
Project: |
Saddle Lake Dam Improvements |
|
Location: |
Tell City, IN USA |
|
Owner: |
USDA Forest Service |
|
Engineer: |
FSMS |
|
Contractor: |
T-C Inc. |
|
Construction: |
August, 2000 - September, 2000 |
|
Tons Mixed: |
18,750 |
|
Description: |
RCC was used for an emergency spillway and overtopping protection
abutment walls were built from formed RCC TC's first RCC job |
|
|
|
|
Project: |
Thomas Dam Rehabilitation |
|
Location: |
Thomas, WV USA |
|
Owner: |
City of Thomas |
|
Engineer: |
Civil Tech Engineering |
|
Contractor: |
Alwood |
|
Construction: |
September, 2000 - October, 2000 |
|
Tons Mixed: |
4,147 |
|
Description: |
RCC was placed against the downstream side of an existing concrete dam
as an abutment . Bringing the dam up to current dam safety standards. |
|
|
|
|
Project: |
Black Rock Dam Rehabilitation |
|
Location: |
Zuni, NM USA |
|
Owner: |
Pueblo of Zuni |
|
Engineer: |
GEI |
|
Contractor: |
Laguna Construction Company |
|
Construction: |
September, 2000 - November, 2000 |
|
Tons Mixed: |
35,449 |
|
Description: |
Repair of Primary Spillway 45 feet high 180" wide Horseshoe shaped
spillway |
|
|
|
|
Project: |
Western Ave Dam |
|
Location: |
Oklahoma City, OK USA |
|
Owner: |
City of Oklahoma City |
|
Engineer: |
Boyle |
|
Contractor: |
Wynn Construction |
|
Construction: |
November, 2000 - February, 2001 |
|
Tons Mixed: |
28,176 |
|
Description: |
RCC was used for the construction of a Flood Control dam in the Canadian
River |
|
|
|
|
Project: |
Jackson Lake Dam Rehabilitation |
|
Location: |
Jackson, OH USA |
|
Owner: |
Ohio Department of Natural Resources |
|
Engineer: |
BBCM |
|
Contractor: |
Lodebar |
|
Construction: |
May, 2001 - May, 2001 |
|
Tons Mixed: |
7,860 |
|
Description: |
Project consisted of RCC emergency spillway on the downstream slope of
the existing Dam |
|
|
|
|
Project: |
North Fork Hughes River Dam |
|
Location: |
Harrisville, WV USA |
|
Owner: |
Natural Resources Conservation Services |
|
Engineer: |
Gannett Fleming |
|
Contractor: |
Barnard |
|
Construction: |
February, 2001 - August, 2001 |
|
Tons Mixed: |
189,000 |
|
Description: |
RCC was used for the construction of a new dam and Spillway with precast
panels for facing upstream and down stream. |
|
|
|
|
Project: |
Teter Creek lake Dam Improvements |
|
Location: |
Meadowville, WV USA |
|
Owner: |
State of WV Division of Natural Resources |
|
Engineer: |
Civil Tech Engineering, Inc. |
|
Contractor: |
West Virginia Paving |
|
Construction: |
July, 2001 - August, 2001 |
|
Tons Mixed: |
11,405 |
|
Description: |
RCC was used for armoring the emergency spillway plating and weir walls. |
|
|
|
|
Project: |
Beach Street RCC Low Water Weir |
|
Location: |
Ft. Worth , TX USA |
|
Owner: |
Tarrant Regional Water District |
|
Engineer: |
Tarrant Regional Water District |
|
Contractor: |
Craig Olden, Inc. |
|
Construction: |
September, 2001 - October, 2001 |
|
Tons Mixed: |
20,164 |
|
Description: |
RCC was used as an instream Dam for grade control of the North Fork
Trinity River and creating a small instream Holding Lake. |
|
|
|
|
Project: |
Skins Lake Spillway Maintenance project |
|
Location: |
Burns Lake, BC CANADA |
|
Owner: |
Alcan Primary Metal Group |
|
Engineer: |
Klohn Crippen |
|
Contractor: |
Skins lake Contractors LTD |
|
Construction: |
September, 2001 - November, 2001 |
|
Tons Mixed: |
49,658 |
|
Description: |
RCC was placed below an existing concrete spillway creating an larger
spillway section and protection the existing spillway from erosion. |
|
|
|
|
Project: |
Vesuvious lake Dam Rehabilitation |
|
Location: |
Ironton, OH USA |
|
Owner: |
USDA Forest Service |
|
Engineer: |
USDA Forest Service |
|
Contractor: |
T-C, Inc. |
|
Construction: |
October, 2001 - December, 2001 |
|
Tons Mixed: |
20,423 |
|
Description: |
RCC was mixed for placing on the downstream slope for protection against
dam overtopping |
|
|
|
|
Project: |
Saluda Dam remediation test section |
|
Location: |
Lexington, SC USA |
|
Owner: |
South Carolina Electric & Gas |
|
Engineer: |
Paul C. Rizzo Associates |
|
Contractor: |
Barnard Construction |
|
Construction: |
November, 2001 - December, 2001 |
|
Tons Mixed: |
13,267 |
|
Description: |
Project consisted of mixing several mix designs so engineers and
contractor could evaluate the RCC that would be used in the Dam project
upcoming. |
|
|
|
|
Project: |
McKinney Lake Dam Rehabilitation |
|
Location: |
Hoffman, NC USA |
|
Owner: |
State of NC Wildlife Resource Commission |
|
Engineer: |
AG& E Schnabel |
|
Contractor: |
Atlas Resource Management,Inc. |
|
Construction: |
November, 2001 - December, 2001 |
|
Tons Mixed: |
4,064 |
|
Description: |
RCC was placed on the downstream side of the existing dam to create an
auxiliary spillway and bring the current dam into compliance with dam
safety regulations. |
|
|
|
|
Project: |
Caldwell Lake Dam Improvements |
|
Location: |
Chillicothe, OH USA |
|
Owner: |
Ohio Department of Natural Resources |
|
Engineer: |
Bowser Morner |
|
Contractor: |
Maiden & Jenkins Construction Co. |
|
Construction: |
May, 2002 - June, 2002 |
|
Tons Mixed: |
11,556 |
|
Description: |
RCC was mixed and placed on the downstream side of dam to protect from
overtopping and to bring dam into current ODNR safety requirements. |
|
|
|
|
Project: |
Great Gorge Dam Rehabilitation |
|
Location: |
Vernon, NJ USA |
|
Owner: |
Mountain Creek Resorts |
|
Engineer: |
Schoor Depalma |
|
Contractor: |
Van Peenan Contractors, Inc. |
|
Construction: |
October, 2002 - December, 2002 |
|
Tons Mixed: |
3,165 |
|
Description: |
PEI inc. crew mixed, placed,formed and compacted RCC on the downstream
slope for overtopping protection, bring the Dam into current Dam Safety
Standards. |
|
|
|
|
Project: |
Stonelick Lake Dam Rehabilitation |
|
Location: |
Goshen, OH USA |
|
Owner: |
Ohio Department of Natural Resources |
|
Engineer: |
Bowser Morner |
|
Contractor: |
Lodebar |
|
Construction: |
May, 2003 - June, 2003 |
|
Tons Mixed: |
8,295 |
|
Description: |
RCC was used for downstream slope protection to bring the dam into
current compliance with Dam Safety requirements |
|
|
|
|
Project: |
Tanglewood Lake Dam Rehabilitation |
|
Location: |
Bainbridge Township, OH USA |
|
Owner: |
Tanglewood Lake Association |
|
Engineer: |
BBCM |
|
Contractor: |
C.J. Natale, Inc. |
|
Construction: |
July, 2003 - August, 2003 |
|
Tons Mixed: |
7,548 |
|
Description: |
RCC was placed on the downstream slope of the dam bring the dam into
compliance with current dam safety regulations. |
|
|
|
|
Project: |
|