bar

Roller Compacted Concrete Projects

bar
Project: Shawnee State Forest Dam Improvements
Location: Portsmouth, OH    USA
Owner: Ohio Department of Natural Resources
Engineer: ODNR Department of Engineering
Contractor: Lodebar
Construction: May, 1999 - June, 1999
Tons Mixed: 15,148
Description: Project consisted of placing RCC on the downstream slope of three different dams with in the Shawnee state park then covered with topsoil.
 
Project: 4th Street Low Water RCC Dam
Location: Ft Worth, TX    USA
Owner: Tarrant County Regional Water District
Engineer: Tarrant County
Contractor: Craig Olden, Inc.
Construction: August, 1999 - September, 1999
Tons Mixed: 20,620
Description: Dam was built instream for flood control and created a upstream recreational lake.
 
Project: Atlanta Road Dam
Location: Marietta, GA    USA
Owner: Paces Properties
Engineer: Schnabel
Contractor: Thalle Construction
Construction: October, 1999 - November, 1999
Tons Mixed: 3,805
Description: Project was constructed for a storm water detention basin to mitigate increased runoff from a new development
 
Project: Lake Tholloco Dam Repair
Location: Ft Rucker, AL    USA
Owner: U.S. Army Corp Of Engineers
Engineer: Law Gibb Group
Contractor: Thalle Construction
Construction: February, 2000 - June, 2000
Tons Mixed: 52,600
Description: RCC was used for an emergency spillway repairing this breached dam from overtopping and bringing it into current dam safety guidelines.
 
Project: Saddle Lake Dam Improvements
Location: Tell City, IN    USA
Owner: USDA Forest Service
Engineer: FSMS
Contractor: T-C Inc.
Construction: August, 2000 - September, 2000
Tons Mixed: 18,750
Description: RCC was used for an emergency spillway and overtopping protection abutment walls were built from formed RCC TC's first RCC job 
 
Project: Thomas Dam Rehabilitation
Location: Thomas, WV    USA
Owner: City of Thomas
Engineer: Civil Tech Engineering
Contractor: Alwood
Construction: September, 2000 - October, 2000
Tons Mixed: 4,147
Description: RCC was placed against the downstream side of an existing concrete dam as an abutment . Bringing the dam up to current dam safety standards.
 
Project: Black Rock Dam Rehabilitation
Location: Zuni, NM    USA
Owner: Pueblo of Zuni
Engineer: GEI
Contractor: Laguna Construction Company
Construction: September, 2000 - November, 2000
Tons Mixed: 35,449
Description: Repair of Primary Spillway  45 feet high 180" wide Horseshoe shaped spillway
 
Project: Western Ave Dam
Location: Oklahoma City, OK    USA
Owner: City of Oklahoma City
Engineer: Boyle
Contractor: Wynn Construction
Construction: November, 2000 - February, 2001
Tons Mixed: 28,176
Description: RCC was used for the construction of a Flood Control dam in the Canadian River
 
Project: Jackson Lake Dam Rehabilitation
Location: Jackson, OH    USA
Owner: Ohio Department of Natural Resources
Engineer: BBCM
Contractor: Lodebar
Construction: May, 2001 - May, 2001
Tons Mixed: 7,860
Description: Project consisted of RCC emergency spillway on the downstream slope of the existing Dam
 
Project: North Fork Hughes River Dam
Location: Harrisville, WV    USA
Owner: Natural Resources Conservation Services
Engineer: Gannett Fleming
Contractor: Barnard
Construction: February, 2001 - August, 2001
Tons Mixed: 189,000
Description: RCC was used for the construction of a new dam and Spillway with precast panels for facing upstream and down stream.
 
Project: Teter Creek lake Dam Improvements
Location: Meadowville, WV    USA
Owner: State of WV Division of Natural Resources
Engineer: Civil Tech Engineering, Inc.
Contractor: West Virginia Paving
Construction: July, 2001 - August, 2001
Tons Mixed: 11,405
Description: RCC was used for armoring the emergency spillway plating and weir walls.
 
Project: Beach Street RCC Low Water Weir
Location: Ft. Worth , TX    USA
Owner: Tarrant Regional Water District
Engineer: Tarrant Regional Water District
Contractor: Craig Olden, Inc.
Construction: September, 2001 - October, 2001
Tons Mixed: 20,164
Description: RCC was used as an instream Dam for grade control of the North Fork Trinity River and creating a small instream Holding Lake.
 
Project: Skins Lake Spillway Maintenance project
Location: Burns Lake, BC    CANADA
Owner: Alcan Primary Metal Group
Engineer: Klohn Crippen
Contractor: Skins lake Contractors LTD
Construction: September, 2001 - November, 2001
Tons Mixed: 49,658
Description: RCC was placed below an existing concrete spillway creating an larger spillway section and protection the existing spillway from erosion.
 
Project: Vesuvious lake Dam Rehabilitation
Location: Ironton, OH    USA
Owner: USDA Forest Service
Engineer: USDA Forest Service
Contractor: T-C, Inc.
Construction: October, 2001 - December, 2001
Tons Mixed: 20,423
Description: RCC was mixed for placing on the downstream slope for protection against dam overtopping
 
Project: Saluda Dam  remediation test section
Location: Lexington, SC    USA
Owner: South Carolina Electric & Gas
Engineer: Paul C. Rizzo Associates
Contractor: Barnard Construction
Construction: November, 2001 - December, 2001
Tons Mixed: 13,267
Description: Project consisted of mixing several mix designs so engineers and contractor could evaluate the RCC that would be used in the Dam project upcoming.
 
Project: McKinney Lake Dam Rehabilitation
Location: Hoffman, NC    USA
Owner: State of NC Wildlife Resource Commission
Engineer: AG& E Schnabel
Contractor: Atlas Resource Management,Inc.
Construction: November, 2001 - December, 2001
Tons Mixed: 4,064
Description: RCC was placed on the downstream side of the existing dam to create an auxiliary spillway and bring the current dam into compliance with dam safety regulations.
 
Project: Caldwell  Lake Dam Improvements
Location: Chillicothe, OH    USA
Owner: Ohio Department of Natural Resources
Engineer: Bowser Morner
Contractor: Maiden & Jenkins Construction Co.
Construction: May, 2002 - June, 2002
Tons Mixed: 11,556
Description: RCC was mixed and placed on the downstream side of dam to protect from overtopping and to bring dam into current ODNR safety requirements.
 
Project: Great Gorge Dam Rehabilitation
Location: Vernon, NJ    USA
Owner: Mountain Creek Resorts
Engineer: Schoor Depalma
Contractor: Van Peenan Contractors, Inc.
Construction: October, 2002 - December, 2002
Tons Mixed: 3,165
Description: PEI inc. crew mixed, placed,formed and compacted RCC on the downstream slope for overtopping protection, bring the Dam into current Dam Safety Standards.
 
Project: Stonelick Lake Dam Rehabilitation
Location: Goshen, OH    USA
Owner: Ohio Department of Natural Resources
Engineer: Bowser Morner
Contractor: Lodebar
Construction: May, 2003 - June, 2003
Tons Mixed: 8,295
Description: RCC was used for downstream  slope protection to bring the dam into current compliance with Dam Safety requirements
 
Project: Tanglewood Lake Dam Rehabilitation
Location: Bainbridge Township, OH    USA
Owner: Tanglewood Lake Association
Engineer: BBCM
Contractor: C.J. Natale, Inc.
Construction: July, 2003 - August, 2003
Tons Mixed: 7,548
Description: RCC was placed on the downstream slope of the dam bring the dam into compliance with current dam safety regulations.
 
Project: