Hazardous Waste Contaminated
Soil Stabilization Projects

Project: HP Pistol Range
Location: Windsor, CO    USA
Owner: Colorado Highway Patrol
Engineer: STC Remediation
Contractor: WRS  Infrastructure and Environmental Inc.
Construction: September, 2000 - September, 2000
Tons Mixed: 1,147
Description: Mixed native soil with Phosphate to stabilize Lead contaminated soil
 
Project: Koppers Wood treating Facility 
Location: Newark, NJ    USA
Owner: Port of Newark
Engineer: KEY Environmental
Contractor: Jay Cashman
Construction: March, 2001 - September, 2001
Tons Mixed: 58,491
Description: On site soil mixing for stabilization of contaminated dirt 
 
Project: M-I Buried Pit Remediation Project
Location: Denver, CO    USA
Owner: Rocky Mountain Arsenal US Army
Engineer: Foster Wheeler
Contractor: Geo-Con, Inc.
Construction: April, 2001 - October, 2001
Tons Mixed: 44,515
Description: Plant mixed contaminated soil with cement to stabilize it so it could be stored in an onsite landfill.
 
Project: Bioremediation of Rocky Mount Airport
Location: Rocky Mount, NC    USA
Owner: IMASCO Holding Group, Inc.
Engineer: Geovation  Technologies
Contractor: Geovation Technologies
Construction: April, 2005 - June, 2005
Tons Mixed: 22,656
Description: Pesticide contaminated soil mixed with a :BioGeoCheMix " (Granules and Pellets)
 
Project: Isaac Walton Gun Club Rehabilitation
Location: Colorado Springs, CO    USA
Owner: Infinity Land Corporation
Engineer: Casey Resources Inc.
Contractor: Colorado Earth & Environmental
Construction: November, 2005 - January, 2006
Tons Mixed: 0
Description: Screening and mixing lead contaminated soil for deposit off site.